As if the name was not enough to make you interested, the guys over at the PNB as called by racers or Pyscho Nitro Blast to those who have not heard of it, it is truly a one of a kind event 34 hours of open practice with an available 40+ hours of practice throughout the event, most guys don't get that give of change in a entire season.
Here is the schedule got from their info page and man can you said that is a lot of ability to throw your rig on the track:
Friday, March 11th
Practice / 1st round of Qualifying:
Practice ends at 5pm Friday afternoon.
Drivers meeting and the posting of heats will be held at 5:30pm Qualifying will start at 6pm and will run until the 1st round is complete. Expected finish time will be around 1am.
After the 1st round of qualifying is complete the track will be open for practice all night until 7am Saturday morning. That’s another 6 hours of practice!
Saturday, March 12th
2 rounds of qualifying:
Qualifying will start at 9am and will run until complete. Expected
finish time will be 9pm. Track will then be shut down and prepped for
the Sunday mains.
Nitro and Electric qualifying format will be as follows:
3 rounds of 10 minute heats. Mandatory pit stop required for Nitros
only!!!! Qualifying points will be in effect with a re-shuffle after
round 1
2WD SCT qualifying will be as follows:
3 rounds of 10 minute heats. Qualifying points will be in effect with a re-shuffle after round 1
4WD SCT qualifying will be as follows:
3 rounds of 10 minute heats. Qualifying points will be in effect with a re-shuffle after round 1
Sunday, March 13th
Mains will start at 7am. Lowest mains run first. All the SCT class mains will all be ran at the end of the nitro c mains.
Pro 1/8 Buggy
A Main 1 hour
B Main 30 min
C main 15 min
All others 10 min
Pro 1/8 Truggy
A Main 1 hour
B Main 30 min
C main 15 min
All others 10 min
Sportsman 1/8 Buggy
A main 45 min
B main 30 min
All other mains 10 min
Sportsman 1/8 Truggy
A Main 45 min
B main 30 min
All other mains 10 min
2WD 17.5 SCT
Double A main 10 min each
All other mains 10 min
4WD Open SCT
Double A main 10 min each
All other mains 10 min
ELECTRIC 1/8 Buggy
Double A main 10 min each
All other mains 10 min
make sure to stay tuned for further updates, we will bring them as we get them.